The upstairs owner sees no leak. The strata manager says to call insurance.

Imagine a Sydney apartment where a ceiling stain develops after heavy rain and water later drips even in dry weather. The upstairs owner says their floor is dry. The strata manager suggests calling the insurer. When mould appears, the upstairs neighbour offers to repaint. First separate the jobs. Someone needs to make the room safe and stop further damage. An investigator needs to establish where water enters, what it travels through and which components require work. The insurer can be notified in parallel. A dry upstairs floor, the location of a stain and a recent storm each tell you something about timing or symptoms. None alone identifies a pipe or a failed waterproofing detail.

Step 1. Protect people and make a record of the urgent report

Keep people away from water near light fittings, outlets or switchboards, and from bulging ceilings or falling material. Do not stand in water to check electrics or puncture a ceiling. Contact the building emergency contact and appropriately qualified professionals. Call emergency services if life is at risk. Where safe, move valuables away and photograph affected belongings. Follow the phone report with an email giving the lot and floor, the location of the hazard, a contact number and available access. Ask who will coordinate temporary protection or isolation and when you will hear back. Make clear that the leak is active if it is still dripping.

Record a wide shot showing the location and a close-up. Keep original files and a short log of the weather, timing, when dripping stopped and what changed the next day. If safe, record the edge of a stain so you can tell an old mark from an expanding one. Separate observations, such as dripping for two hours after rain stopped, from theories about the wall or an upstairs supply. Record only places you may access and ask the manager to coordinate other access. For a rented property, give the tenant the urgent reporting and safety contacts and separately follow up the tenancy repair and occupancy issues with the rental property manager.

Step 2. Write a request someone can act on

Address it to the owners corporation through the strata manager or committee and keep copies. Lead with the action sought, such as arranging a suitably qualified contractor to investigate an ongoing leak and confirming the appointment. Attach a few dated photos and a one-page timeline. Ask who is coordinating, when inspection will happen, whether other lots or roof access are needed and when written preliminary findings are expected. If it only happens in rain, ask how repeat inspection or monitoring can be arranged. Keep a running note of replies, promised dates and open actions.

For example, write that dripping started beside the balcony on the evening of 6 May and continued after the rain ended. Ask for the emergency measures, booking, access arrangements, report contact and the number to call if it recurs. Request a response time that matches the risk. If the matter has gone to the committee, ask when it was referred, how it will be recorded and when the next update is due. Confirm verbal replies by short email.

Step 3. Establish the entry point and who looks after the component

Water can travel along framing, cavities and pipes before appearing indoors. Possible sources include a roof, an external wall, a shared service, equipment serving one lot or more than one defect. Ask the investigator to identify the conditions on the day, areas inspected and inaccessible, tests performed, likely entry points, affected materials and proposed work. Indoor moisture readings can establish dampness without identifying the entry point. If a report suggests a balcony, ask whether it points to a drain, threshold, membrane or external joint, and what further inspection would distinguish them.

The owners corporation has a statutory duty to maintain and repair common property. Check the registered strata plan, relevant by-laws and supporting records for the particular component. Boundaries and exclusive-use or maintenance arrangements can differ between schemes. Ask for the relevant drawing or clause and the reasons for the proposed allocation. Repairs to a common-property component and compensation for damaged personal belongings involve separate questions. If evidence points to equipment in one lot, ask how that owner will be notified and access coordinated, and ask the insurer about preserving evidence if recovery is an issue. Keep a separate record of notification dates for developer warranties, insurance and building defects where relevant.

In the example, the first visit identifies moisture near a balcony door and the second controlled investigation finds water entering at an external joint. The rain log helps schedule useful follow-up. If the second visit instead finds a washing-machine supply connection leaking upstairs, the parties and repair scope may change. Ask the investigator to distinguish observed facts from conclusions.

Step 4. Specify the repair and document losses separately

Ask the responsible party to confirm temporary protection, permanent scope, expected start and the follow-up inspection. If there will be scaffolding, restricted rooms or access to several lots, ask how interim measures will be maintained and who will provide updates. If quotes are being sought, ask what scope they cover, whether there is temporary protection and when the decision is expected. Keep the completed scope, work dates and follow-up findings. Ask whether rain or appropriate testing is needed to verify the repair. Follow professional advice about moisture before enclosing or repainting indoor materials.

Keep separate photos and invoices for temporary drainage, drying, inspection, cleaning and damaged possessions. Give insurers the chronology, ask for claim numbers and find out which urgent work can proceed, what evidence to keep and what notices are required. Building, contents and tenancy-related policies may respond to different losses. An insurer's verbal response does not establish legal responsibility for a component. If you move out, lose rent or sustain significant losses, record the usable rooms, actual expenses and steps taken to reduce loss. A possible claim depends on the duty, evidence, policy and applicable deadlines.

Step 5. Escalate with a specific request

Summarise on one page whether the danger is controlled, what was investigated, what is stalled and what order or agreement would resolve it. Make a formal written request through the manager or committee and keep any meeting decision or correspondence. NSW Fair Trading provides strata mediation. Most strata disputes require an attempt at mediation before an application to the NSW Civil and Administrative Tribunal, with exceptions for some applications. Be clear about whether you seek inspection access, specified repairs or resolution of a loss claim. Different evidence and processes may apply. If there is continuing significant damage or a question about urgent orders, jurisdiction or compensation deadlines, seek individual advice early. Bring the plan, by-laws, reports, expenses and correspondence. Record when you first became aware of each loss so that applicable law and transitional arrangements can be assessed.

Common questions

Can I arrange repairs and send the manager the bill? Protect people and contact the emergency contacts first if there is an immediate hazard. For work affecting common property, try to confirm authority, scope and costs in writing before commissioning it. Reimbursement depends on the circumstances and applicable rules. Keep the booking and invoice and distinguish temporary protection, investigation and permanent works.

What if the committee is waiting for a meeting? Ask what decision is pending, what interim measures are in place and when they will be reviewed. Report worsening water damage immediately. Common-property repair duties have conditions and exceptions. Documenting the ongoing impact helps the people handling the report assess urgency.

The stain came back after painting. Should I retain the original records? Yes. Compare the edge, timing and location of new and old marks, and document what work happened between them. Old marks can persist and fresh moisture can indicate continuing ingress. Ask a professional to check dryness and whether the prior scope addressed the entry point.

What should I chase while waiting for the report? Confirm who is handling safety and temporary protection. Ask what information the investigator still needs, who will obtain access or arrange testing and when the next update is due. Keep recording evidence and follow any insurer notification requirements in parallel.

John Wu, solicitor

ABOUT THE AUTHOR

John Wu · 吴瀚律师

Senior solicitor, Sunsolis Legal · Solicitor, Supreme Court of NSW · Juris Doctor, UNSW · Solicitor Member, The Law Society of NSW

View WeChat QR codeJohn Wu WeChat QR code, john-lawyer

Disclaimer

This article provides general legal information for public education only. It is not legal advice for any person, business or particular matter and should not be the sole basis for taking, or deciding not to take, action. Federal, state and territory laws differ and legislation, policy and case law may change. Read the article together with its jurisdiction, source-check date and verification limits. The appropriate approach depends on the particular facts, evidence, documents and applicable law; obtain independent advice about your own circumstances before making decisions. Reading this article, using this website or making preliminary contact does not establish a solicitor–client relationship. Acceptance of instructions and the scope of services must be separately confirmed. Do not send sensitive or confidential material before conflict checks and an appropriate document-submission method have been agreed. Seek prompt legal assistance for limitation periods, court deadlines or urgent matters; do not delay while waiting for a response. Nothing in this statement excludes or limits rights or liabilities that cannot lawfully be excluded or limited.

Full website disclaimer →